The scope of this project was as follows:
1) Evaluate existing used power plant equipment for installation in a paper mill
sludge and wood waste fired power plant. Plant includes a 200,000 #/hr, 850
psig, 900oF bubbling bed boiler and a 24 MW extraction and condensing
turbine/generator.
2) Selection of all equipment.
3) Determine equipment required on the boiler to meet present DEQ & EPA
requirements.
4) Complete engineering for power plant, sludge dewatering, and wood yard
installation.
5) Project Management.

The following engineering tasks were completed as part of this project:
With the increased environmental concerns and fluctuating costs with using fossil fuels as an energy source, Evergreen expects to see more interest in Biomass fuels in the immediate future.
In addition to other services, Evergreen can provide:
• Power Plant Heat and Mass Balance Evaluation
•Overall Plant General Arrangements and Layouts
•Structural, Including Top Hung Boiler Structure
•Boiler Island Design around B&W Field Erected Boiler
•Air Emission Permitting
•Emission Controls Design
•Turbine Island Design
•Cooling Tower Installation Design
•Sludge Dewatering System Design
•Design of all Foundations
•Building Design
•Developed all P&ID’s
•Design of all Electrical Systems Including
Utility Substation Tie-Ins
•Design of Instrumentation and Controls
•Piping Design
•FM and Insurance Carrier Requirements
•Drawing Requirements and Standards
•Budget Controls
•Project Scheduling
•Project Management